Log in
x
or
x
Register
x
or

October 6, 2017 These are talking points that can be used when addressing concerns to elected officials. Parking and access to recreation opportunities is a huge issue in the Sea to Sky corridor. The road slump on the Whistler side along the park access right-of-way is in a geologically unstable area. The right-of-way was "repaired" at a cost of $50,000 in the summer of 2016. The repaired area washed out a month later in October rains. Land surveys show the slump continues to move downhill...

Powered by CjBlog