Lesley Bohm letter to Pique Magazine (2015-11-19))
Lesley Bohm letter to Pique Magazine (2015-11-19))
Description
Letter to the Editor that appeared in Pique Newsmagazine on November 19, 2015 written by Lesley Bohm.
It has been 12 years since we lost access to the Singing Pass trail parking lot to a washout. Engineering science says that the road to the parking lot is unfixable as it will continue to slump. The road to the IPP on the Blackcomb side of Fitzsimmons Creek is an alternative, but is currently gated and the creek remains un-bridged.
Several branches of government are theoretically in favour of an improvement in the situation, but it has become "no-one's priority" since 2012.
×